©
Suncast Corporation
page 13
The window and door headers are comprised of extra strong 2x4 and plywood materials and
require assembly. Please refer to the instructions below to assemble all headers for this unit.
H1: Layout two 2x4s
and one plywood
strip.
H2: Place plywood strip between 2x4s, align all
edges, and fasten together using 2-1/2” galvanized
12d nails.
H3: Install header upright
keeping 2x4 edge flush
with wall studs as shown.
Repeat these steps for
each window and door
header.
Summary of Contents for Keystone Garage
Page 10: ...Page 10...
Page 14: ...Page 13b...
Page 19: ...End Wall Layout One Window Configuration 2 Page 18...
Page 20: ...End Wall Layout Two Windows Configuration 3 Page 19...
Page 21: ...Optional Garage Door Layout Configuration 4 Page 20...
Page 28: ...Rafter Layout Page 27...
Page 45: ...page 44 Door Stop Installation Step 140 Install door stop on both doors as Suncast Corporation...