Step 41: Lift and set wall repeat-
ing steps from back wall. Fasten
wall bottom plate to floor and
siding to floor repeating step 30.
Step 39: Take remaining 16-3/4”x4’ door header siding, mark piece,
cut siding piece to fit using mark and install as shown.
Step 42: Use extra wall stud
to brace wall to floor as shown
(make sure wall is plumb before
fastening).
Step 40: Install remaining siding
pieces.
page 16
©
Suncast Corporation
Summary of Contents for Keystone Garage
Page 10: ...Page 10...
Page 14: ...Page 13b...
Page 19: ...End Wall Layout One Window Configuration 2 Page 18...
Page 20: ...End Wall Layout Two Windows Configuration 3 Page 19...
Page 21: ...Optional Garage Door Layout Configuration 4 Page 20...
Page 28: ...Rafter Layout Page 27...
Page 45: ...page 44 Door Stop Installation Step 140 Install door stop on both doors as Suncast Corporation...