Step G6: Install siding, keep-
ing top of siding flush with line
snapped on previous step.
Step G8: Install gable roof siding after installing end rafter repeating steps from opposite gable wall. Cut
out excess siding at top of door opening.
Step G7: Cutout overhead door opening using a skill saw or router.
Step G9: Install trim filler strips at border of overhead door opening as shown.
page 46
©
Suncast Corporation
Summary of Contents for Keystone Garage
Page 10: ...Page 10...
Page 14: ...Page 13b...
Page 19: ...End Wall Layout One Window Configuration 2 Page 18...
Page 20: ...End Wall Layout Two Windows Configuration 3 Page 19...
Page 21: ...Optional Garage Door Layout Configuration 4 Page 20...
Page 28: ...Rafter Layout Page 27...
Page 45: ...page 44 Door Stop Installation Step 140 Install door stop on both doors as Suncast Corporation...