page 25
©
Suncast Corporation
Step 58: Mark siding 8” from top of wall on both ends of gable wall
and snap a line as shown.
Step 60: Install first gable siding piece, keeping piece aligned at ends and with chalk lines as shown.
Note: Siding grooves should also align with grooves on lower wall.
Step 61: Install pre-cut gable
siding brace at siding splice as
shown.
Gable Siding Installation
Step 59: Starting with overlap at
front, layout gable siding pieces
as shown.
Note: There is a left and right
for end gable siding pieces.
Front piece for left gable wall
is 15” wide.
Step 62: Install remaining gable siding pieces repeating previous
steps. Repeat on opposite gable wall.
Note: If one gable wall has overhead door opening, see
instructions on pages 45-47.
Summary of Contents for Keystone Garage
Page 10: ...Page 10...
Page 14: ...Page 13b...
Page 19: ...End Wall Layout One Window Configuration 2 Page 18...
Page 20: ...End Wall Layout Two Windows Configuration 3 Page 19...
Page 21: ...Optional Garage Door Layout Configuration 4 Page 20...
Page 28: ...Rafter Layout Page 27...
Page 45: ...page 44 Door Stop Installation Step 140 Install door stop on both doors as Suncast Corporation...