Step 2: Layout six 8’ pressure treated 2”x4” floor plates, square joists at one end, and mark off for floor
joists at 12” on center as shown.
Step 3: Layout floor as shown.
Note: See attached drawing
for correct layout.
Step 9: Fasten plywood sections to floor joists using 7d 2-1/4” galvanized
nails spaced 8” apart.
Note: It
is important to properly align plywood at edges.
Step 4: Attach short floor joists
to long floor joists using using 6d
2” nail and OSB pcs, keeping all
pieces flush at top.
Step 5: Attach floor joists togeth-
er at appropriate measurements
using two 12d 3” nails per joist
Step 6: Attach outside band-
board joists together as shown.
Step 7: Make sure floor is
square. Floor is square when
diagonal measurements are
equal (approximately 27’5/8”).
Step 8: Layout plywood floor
sections as shown.
page 7
©
Suncast Corporation
Tip: It is
important
to level
floor
before
proceed-
ing to
next
step.
Summary of Contents for Keystone Garage
Page 10: ...Page 10...
Page 14: ...Page 13b...
Page 19: ...End Wall Layout One Window Configuration 2 Page 18...
Page 20: ...End Wall Layout Two Windows Configuration 3 Page 19...
Page 21: ...Optional Garage Door Layout Configuration 4 Page 20...
Page 28: ...Rafter Layout Page 27...
Page 45: ...page 44 Door Stop Installation Step 140 Install door stop on both doors as Suncast Corporation...