32
Netra 240 Server Service Manual
• June
2004
4. Power on the server.
See
“Powering On the Server” on page
Avoiding Electrostatic Discharge
Whenever you work with the server’s internal components, follow this procedure to
prevent damage caused by static electricity.
You need the following items:
■
Antistatic wrist or foot strap
■
Antistatic mat
1. Power off the system.
See
“Powering Off the Server” on page
2. Remove the server cover.
See
“Removing the Server Cover” on page
3. Attach one end of the antistatic strap to the grounding point inside the server, and
the other end to your wrist (
FIGURE
2-8
Grounding Point in the Server
Grounding point in server
Summary of Contents for Netra 240
Page 7: ...Contents vii Index 133...
Page 8: ...viii Netra 240 Server Service Manual June 2004...
Page 12: ...xii Netra 240 Server Service Manual June 2004...
Page 70: ...52 Netra 240 Server Service Manual June 2004...
Page 84: ...66 Netra 240 Server Service Manual June 2004...
Page 120: ...102 Netra 240 Server Service Manual June 2004...
Page 124: ...106 Netra 240 Server Service Manual June 2004...
Page 132: ...114 Netra 240 Server Service Manual June 2004...