SECTION 6 - OPTION NOTES AND INSTRUCTIONS
6.7
6.9. FOAM MARKER
6.10. BOOM CLEAN OUT OPTION
To install a foam marker Summers sprayer.
1. Determine side of sprayer to mount platform. Summers Mfg. Co., Inc. installs all platforms on right side
of machine. Some sprayer models will have space on left side of machine so it may be desirable to mount
it there.
2. Mount foamer platform.
3. Mount foamer on platform.
4. Assemble foam nozzle per foamer instructions.
5. Mount foamer nozzle on outer end of boom. Nozzle should not extend beyond the booms and must remain
out of harms way during folding and unfolding.
6. Attach foamer lines to nozzle.
7. Route lines out of harms way back to foamer and secure to non moving parts.
8. Mount foamer control switch box near operator station.
9. Connect power source wires to strong battery power and ground terminals.
10. Route harness to foamer and connect mating connectors.
11. Mix foam and water per instructions.
12. Verify proper foamer operation
Cam lock couplings can be placed in desired location on the wet boom. Cam lock couplings can be used
for
fl
ush sediment out of the wet boom tube or they can function as a boom drain. Boom cleanout quantity
should closely match the number of boom control shut offs.
Clean out installation.
1. Decide the purpose of cleanout operation. Drainage or
fl
ushing?
2. Decide on quantity of cleanouts required.
3. Verify suf
fi
cient room to mount clean out. If clean out can not be mounted on extreme run of boom sec-
tion a location nearest the end may be adequate.
4. Mark aluminum for cleanout or Tee installation. For a tee installation – 2-3/4” of aluminum must be cut
out of the section and threaded so 20 nozzle spacing is maintained.
5. Install all
fi
ttings and check for interference and ease of operation.
Summary of Contents for ULTIMATE NT
Page 12: ...1 6 SECTION 1 SAFETY 14 PN 8Z0290 SINGLE TANK PLUMBING DECAL 13 PN 8Z0288 RINSE TANK DECAL ...
Page 26: ... 2 12 ...
Page 27: ... 2 13 ...
Page 46: ...SECTION 3 MAINTENANCE 3 4 NOTES ...
Page 54: ...SECTION 5 ELECTRICAL 5 2 ...
Page 55: ...SECTION 5 ELECTRICAL 5 3 BOOM FOLD TIPLIFT END NOZZLE HEIGHT VERTICAL ...
Page 56: ...SECTION 5 ELECTRICAL 5 4 ...
Page 57: ...SECTION 5 ELECTRICAL 5 5 ...
Page 58: ...SECTION 5 ELECTRICAL 5 6 ...
Page 59: ...SECTION 5 ELECTRICAL 5 7 ...
Page 60: ...SECTION 5 ELECTRICAL 5 8 ...
Page 116: ...SECTION 8 PARTS 8 42 ...
Page 120: ...SECTION 8 PARTS 8 46 ...
Page 154: ...SECTION 8 PARTS 8 81 SECTION 8 PARTS ...
Page 162: ...SECTION 8 PARTS 8 89 SECTION 8 PARTS ...
Page 163: ...8 90 SECTION 8 PARTS SECTION 8 PARTS ...
Page 164: ...SECTION 8 PARTS 8 91 SECTION 8 PARTS ...
Page 165: ...SECTION 8 PARTS 8 92 SECTION 8 PARTS ...
Page 166: ...SECTION 8 PARTS 8 93 SECTION 8 PARTS ...
Page 167: ...SECTION 8 PARTS 8 94 SECTION 8 PARTS ...
Page 168: ...SECTION 8 PARTS 8 95 SECTION 8 PARTS ...
Page 169: ...SECTION 8 PARTS 8 96 SECTION 8 PARTS ...