![Summers ULTIMATE NT Operator'S Manual Download Page 29](http://html.mh-extra.com/html/summers/ultimate-nt/ultimate-nt_operators-manual_1391164029.webp)
2.15
SECTION 2 - SPRAYER OPERATION
B. Set up Normal Spraying
and fill tank(s) through top fillwell
.
2. PRIME SPRAYER SYSTEM PUMP
A. Set up Normal Spraying.
B. Prime PTO driven pump:
1. Engage tractor PTO system and increase to normal field PTO speed to circulate water from the
tank to the pump and back to the tank again through the agitators. Immediately verify agitator
flow by looking through top fillwell
.
2. Disengage tractor PTO system.
Summary of Contents for ULTIMATE NT
Page 12: ...1 6 SECTION 1 SAFETY 14 PN 8Z0290 SINGLE TANK PLUMBING DECAL 13 PN 8Z0288 RINSE TANK DECAL ...
Page 26: ... 2 12 ...
Page 27: ... 2 13 ...
Page 46: ...SECTION 3 MAINTENANCE 3 4 NOTES ...
Page 54: ...SECTION 5 ELECTRICAL 5 2 ...
Page 55: ...SECTION 5 ELECTRICAL 5 3 BOOM FOLD TIPLIFT END NOZZLE HEIGHT VERTICAL ...
Page 56: ...SECTION 5 ELECTRICAL 5 4 ...
Page 57: ...SECTION 5 ELECTRICAL 5 5 ...
Page 58: ...SECTION 5 ELECTRICAL 5 6 ...
Page 59: ...SECTION 5 ELECTRICAL 5 7 ...
Page 60: ...SECTION 5 ELECTRICAL 5 8 ...
Page 116: ...SECTION 8 PARTS 8 42 ...
Page 120: ...SECTION 8 PARTS 8 46 ...
Page 154: ...SECTION 8 PARTS 8 81 SECTION 8 PARTS ...
Page 162: ...SECTION 8 PARTS 8 89 SECTION 8 PARTS ...
Page 163: ...8 90 SECTION 8 PARTS SECTION 8 PARTS ...
Page 164: ...SECTION 8 PARTS 8 91 SECTION 8 PARTS ...
Page 165: ...SECTION 8 PARTS 8 92 SECTION 8 PARTS ...
Page 166: ...SECTION 8 PARTS 8 93 SECTION 8 PARTS ...
Page 167: ...SECTION 8 PARTS 8 94 SECTION 8 PARTS ...
Page 168: ...SECTION 8 PARTS 8 95 SECTION 8 PARTS ...
Page 169: ...SECTION 8 PARTS 8 96 SECTION 8 PARTS ...