2.2
SECTION 2 - SPRAYER OPERATION
2.2 INITIAL SET-UP AND ADJUSTMENT OF MECHANICAL (CONVERT FROM TRANSPORT
TO FIELD OPERATION)
1. COMPLETE WARRANTY REGISTRATION CARD
A. Complete and return WARRANTY REGISTRA-
TION CARD located at the
beginning of
this
manual.
RETURNING CARD ENTITLES YOU
TO A FREE GIFT.
B. Complete the
OWNER REGISTER also located at the
beginning of this manual (Serial Number
is located by the hitch piece).
REMEMBER TO BRING OWNER REGISTER INFORMA-
TION
WHEN ORDERING PARTS.
2. LEVEL THE CART
Before connecting to tractor, determine best vertical location of hitch piece in order to run a level cart:
A. Level the cart front to back.
B. Measure tractor drawbar to determine best vertical location of hitch piece.
3. MAKE TRACTOR TO SPRAYER HOOKUPS
A. Make hitch connection using a draw pin with keeper and safety chain. A spacer between sprayer
tongue and tractor clevis will minimize hitch noise and shock.
B. Retract jack and rotate into storage position.
C. Plug in hydraulics to tractor remote outlets for boom and hydraulic pump operation.
D. Prepare to mount hydraulic switch control box in cab and run cable to rear of tractor.
1. Select a convenient
location. Surface
must be smooth and
clean for suction cups
to attach.
2. If tractor is equipped
with factory accessory
power plug, discon-
nect 3-foot pigtail
lead from control box
and couple to tractor
power plug.
3. For tractors not
equipped with a pow-
er plug connect black
lead to a good ground
and the other wire to a
12-volt keyed power
supply.
4. Route 6 pin connectors through tractor cab to drawbar area and secure in a safe place.
E. Hook all electrical leads to mating connectors near hitch.
CAUTION
REVIEW SECTION 2.1 SPRAYER
OPERATION SAFETY BEFORE
PROCEEDING
Summary of Contents for ULTIMATE NT
Page 12: ...1 6 SECTION 1 SAFETY 14 PN 8Z0290 SINGLE TANK PLUMBING DECAL 13 PN 8Z0288 RINSE TANK DECAL ...
Page 26: ... 2 12 ...
Page 27: ... 2 13 ...
Page 46: ...SECTION 3 MAINTENANCE 3 4 NOTES ...
Page 54: ...SECTION 5 ELECTRICAL 5 2 ...
Page 55: ...SECTION 5 ELECTRICAL 5 3 BOOM FOLD TIPLIFT END NOZZLE HEIGHT VERTICAL ...
Page 56: ...SECTION 5 ELECTRICAL 5 4 ...
Page 57: ...SECTION 5 ELECTRICAL 5 5 ...
Page 58: ...SECTION 5 ELECTRICAL 5 6 ...
Page 59: ...SECTION 5 ELECTRICAL 5 7 ...
Page 60: ...SECTION 5 ELECTRICAL 5 8 ...
Page 116: ...SECTION 8 PARTS 8 42 ...
Page 120: ...SECTION 8 PARTS 8 46 ...
Page 154: ...SECTION 8 PARTS 8 81 SECTION 8 PARTS ...
Page 162: ...SECTION 8 PARTS 8 89 SECTION 8 PARTS ...
Page 163: ...8 90 SECTION 8 PARTS SECTION 8 PARTS ...
Page 164: ...SECTION 8 PARTS 8 91 SECTION 8 PARTS ...
Page 165: ...SECTION 8 PARTS 8 92 SECTION 8 PARTS ...
Page 166: ...SECTION 8 PARTS 8 93 SECTION 8 PARTS ...
Page 167: ...SECTION 8 PARTS 8 94 SECTION 8 PARTS ...
Page 168: ...SECTION 8 PARTS 8 95 SECTION 8 PARTS ...
Page 169: ...SECTION 8 PARTS 8 96 SECTION 8 PARTS ...