XT
-
VISION
C
ONFIGURING THE
V
ISION
XT
P
OLYVRAC CONSOLE
D4.6
N
AME
:
T
RAINING DEPARTMENT
D
ATE
:
04/2018
P
AGE
:
94/109
REFERENCE:
TECHNICIAN’S
OPERATING
MANUAL
POLYVRAC
XT
VISION
I
ND
02
r)
Electric rate actuator calibration:
In the
Sensor configuration
menu, press
.
Enter
Actuator length ___
(DPB = 300 / ECONOV = 250)
Go down to
V SHUT
then
V OPEN
and enter the values read before
validating.
In
Length Limit
, display
D
with
and indicate the
corresponding value
(DPB = D 200 / ECONOV D 250)
Go back up to
Channel:
and display the
Channel:
page
2.0
by pressing
Repeat the operations on Channel 2
s)
ECONOV actuator option
From the
Actuators
page, display
Channel: Left Spout
with
If it is an Econov machine, display on the
Function:
line
Econov
using
(Otherwise leave "not used")
In the
Initialisation X
line, enter
15
Go back up to the first line and display
Channel: Right Spout
with
and repeat the operation.
t)
TRIBORD option
From the
Actuators
page, display
Channel: TRIBORD
with
If it is a machine equipped with TRIBORD, display on the 2nd line
Function: TRIBORD 3D
using
(Otherwise leave "not
used")
Press
ESC
2 times
u)
Gate setup:
Access the
SETUP
menu by pressing
. Then select
3. Factory
config
Enter the PIN code: "
0035"
and validate with
Press
1. Machine options
Enter the values:
DPB
ECONOV
GATE WIDTH:
0.80
0.58
REDUCER COEFF
0.50
0.50
PI
25.0
40.0
Pq
-50
-62
Manual control
X
RTS
The "
-" symbol is obtained by pressing
Press
ESC
to exit
DPB
ECONOV
Summary of Contents for Polyvrac XT 100 VISION
Page 1: ......