(©Aug, 2007)
FLAiR Series Installation, Operation & Maintenance Manual
Air Technology Systems, Inc.
FCS- 018- G
OHS = Overhead System
VFS = Vertical Floor System
FCS = Floor Console System
GPS = Glycol Pump System
COS = CyberONE System
MCS = Modular Cyber System
Nominal Capacity in 1,000’s of BTU/Hr
AHU
= Air Handling Unit
AR
= Air-Cooled Remote (Split)
C
= Chilled Water System
G
= Glycol-Cooled
GRC = Glycol-Cooled Remote
Condensing Unit
RCU-O = Outdoor Propeller Remote
Condensing Unit
RCU-I = Indoor Centrifugal Remote
Condensing Unit
W
= Water Cooled
WRC = Water-Cooled Remote
Condensing Unit
Notice
This document contains information protected by copyright. All rights are reserved. The owner of the equipment for
which this manual is written may photocopy the contents of this manual for internal use only. No part of this docu-
ment may be photocopied, reproduced, or translated into another language for use by anyone other than the owner
of the equipment for which this manual is written without the prior written consent of Stulz Air Technology Systems,
Inc. (SATS).
This document contains confidential and proprietary information of Stulz Air Technology Systems, Inc. Distributing or
photocopying this document for external distribution is in direct violation of U.S. copyright laws and is strictly
prohibited without the express written consent of SATS.
Unpublished — rights reserved under the copyright laws of the United States and of other countries.
Other brands and tradenames are trademarks of their respective owners.
Copyright 2007 by Stulz Air Technology Systems, Inc.
Printed in the United States of America.
All rights reserved.
Stulz Air Technology Systems, Inc.
1572 Tilco Drive
Frederick, MD 21704
USA
08/07
MODEL NOMENCLATURE
Summary of Contents for FLAIR series
Page 1: ...FLAiR Series Installation Operation Maintenance Manual Aug 2007 Air Technology Systems Inc ...
Page 42: ... Aug 2007 FLAiR Series Installation Operation Maintenance Manual Air Technology Systems Inc ...
Page 44: ... Aug 2007 FLAiR Series Installation Operation Maintenance Manual Air Technology Systems Inc ...
Page 46: ... Aug 2007 FLAiR Series Installation Operation Maintenance Manual Air Technology Systems Inc ...
Page 48: ... Aug 2007 FLAiR Series Installation Operation Maintenance Manual Air Technology Systems Inc ...