
... 4 ...
INSTALLATION OF THE DISCHARGE LAMP MSD/2 250W
(see pic.3)
1) Disconnect power before lamp’ s replacement
2) Wear gloves and goggles
3) Unscrews the four screws on the aluminium cover
4) Remove the foam rubber protection and preserve it to successive fixture transport
5) Fully open the eight dichoics and the shutter blades (C and F)
6) Uncrews the two screws A and B and remove the reflector parabole (D)
7) Install the new lamp (E) in the lamp’s socket
Do not touch the quarz bulb with fingers. If this happenes, clean the bulb before use with dry cloth and alcohol.
8) Install again the reflector parabole in the original position and screw the two screws A and B again
9) Install again in the correct position the glass cover
10)Check carefully the correct position of the wire protection gum
11) Screw the four screws
In case of replacement of the lamp or maintenance, do not open
the fixture unless 5 minutes have passed from the switching off.
This operation has to be done when the apparatus is disconnected
from the mains supply
In case of fixture transport, always remove the lamp and insert again
the foam rubber protection as original packing to preserve the dichroic
blades
WARNING
!
pic.3
SCREW (A)
SCREW (B)
LAMP (E)
PARABOLE (D)
DICHROIC BLADE (C)
SHUTTER BLADE (F)
INSTALLATION OF THE LAMP
Summary of Contents for 0102
Page 16: ...15 NOTE...