![Stryker Secure 3000 Maintenance Manual Download Page 116](http://html.mh-extra.com/html/stryker/secure-3000/secure-3000_maintenance-manual_1386019116.webp)
Chapter Five – Maintenance Procedures – Litter
116
5.9 POWER CORD REPLACEMENT
(POWER CORD KIT P/N 3000–300–737)
Required Tools:
Heyco Pliers
1/4” Nut Driver
Side Cutters
5/16” Nut Driver
Procedure: (This procedure will take approximately 15 minutes)
1. See page for proper routing of the power cord.
2. Unplug the power cord from the wall receptacle.
3. Remove litter access panels 3 and 4 (see page 94).
4. Using Heyco pliers, remove the power cord strain relief connector.
5. Using side cutters, cut all cable ties harnessing the power cord to other cables.
6. Using a 1/4” nut driver, remove the two clamps holding the power cord to the litter.
7. Unplug the power cord from the litter junction power board.
NOTE
Notice the plug location for proper installation of the new power cord.
8. Using a 5/16” nut driver, remove the screw holding the power cord ground cable to the base.
NOTE
Notice the arrangement of the star washers so the new ground wire will be installed properly.
9. Reverse the above steps to install the new power cord.
5.10 LITTER GREASE POINTS
1. All litter pivot joint bushings – ”Syntech” synthetic grease.
2. All Gatch and Fowler pivot link bushings – ”Syntech” synthetic grease.
3. Gatch drive screw and Gatch pan slide surface – ”Syntech” synthetic grease.
4. Fowler drive screw – ”Mobil 28” grease.
Summary of Contents for Secure 3000
Page 78: ...Notes 78 ...
Page 106: ...Notes 106 ...
Page 184: ...Notes 167 2 ...
Page 241: ...Appendix B Circuit Board Locations Bed Wiring Diagrams 222 This page intentionally left blank ...
Page 243: ...Appendix B Circuit Board Locations Bed Wiring Diagrams 224 This page intentionally left blank ...
Page 249: ...DH 3 94 3000 000 020 REV B 420 Alcott Street Kalamazoo MI 49001 ...