Required Tools
Unpacking and Positioning the Cabinet
1-3
Required Tools
To install the system, the following tools are necessary:
#2 Phillips screwdriver
Scissors or utility knife
Metal shears to cut pallet straps
3/8” drive ratchet with 9/16” socket
Open-ended 9/16” box wrench
Assorted open-end and/or box wrenches
ESD static kit
Assorted tie wraps
Unpacking the Cabinet
The cabinet-mounted system is enclosed in a cardboard shipping container, which is
secured to a shipping pallet by exterior tie-down straps. (Inside the cardboard, interior
straps secure the cabinet to the pallet.) A ramp for rolling the cabinet off the pallet is
attached to the front of the shipping container, along with two transition plates, which
you use to secure the ramp to the pallet. A lever bar is secured to the ramp, for use in
tipping the cabinet to remove it from the pallet. Labels on the cardboard cap indicate
the front and rear of the cabinet.
shows a shipping container for a 38U cabinet that contains one or more
systems and optional components. (“U,” for
unit
, equals 1.75 inches (in.), or 4.45
centimeters (cm).)
Summary of Contents for V 6624
Page 1: ...Stratus Technologies R005S 00 Stratus ftServer V 6624 Hardware Installation Guide...
Page 8: ...Tables viii Stratus ftServer V 6624 Hardware Installation Guide R005S...
Page 32: ...Disposing of Shipping Materials 1 20 Stratus ftServer V 6624 Hardware Installation Guide R005S...
Page 78: ...Replacing a U779V Fabric Switch A 24 Stratus ftServer V 6624 Hardware Installation Guide R005S...