32
MUD BUGGY
operation
SAFETY SYMBOLS
Safety symbols are used in these instructions to bring attention to actions that may cause
personal injury or damage to the equipment. Always observe these symbols, they are
included for your safety and for the protection of the machine.
DELIVERY INSPECTION
Upon receipt of your equipment, CAREFULLY CHECK FOR ANY FREIGHT DAMAGE. Any
damage should be immediately reported to the carrier and a claim registered.
This unit is manufactured to the strictest specifications and inspection procedures. If
any material or manufacturing defects are found, return the tag on the machine with the
assemblers signature and your findings to the manufacturer. We want to know when a
product is less than perfect. We also welcome any and all input on how the product may
serve you better.
BREAK-IN PERIOD
This unit is ready for normal operation. However, extra care during the first 50 hours of
operation will result in more satisfactory, long-term machine performance and cost of
ownership. Do not exceed 50 hours of operation before conducting the break-in first
service.
Run engine at full throttle.
Idle engine 3 minutes before stopping.
DO NOT idle engine for long periods.
Check engine oil level daily.
Periodically inspect for loose hardware.
KNOW YOUR BUGGY
Read and understand the owners manual before starting the unit. Make sure you under-
stand the purpose of every control. When operating the unit, remember the capacity it can
carry and adjust speed and load for changing conditions.
Inspect Machinery
A daily inspection of the unit is recommended to ensure all systems are in proper working
order.
Check Travel Path
Inspect the surface on which the unit is going to travel. Avoid soft soil, slippery spots, and
water spots. Avoid anything that could make you lose control.
Summary of Contents for Mud Buggy FB1000
Page 7: ...Stone Construction Equipment Inc 1 Introduction ...
Page 11: ...Stone Construction Equipment Inc 2 Technical Data ...
Page 17: ...17 MUD BUGGY Technical Data P N PLATE LOCATION SS N Plate SEngine P N ...
Page 19: ...Stone Construction Equipment Inc 3 Health Safety ...
Page 29: ...Stone Construction Equipment Inc 4 Operation ...
Page 43: ...Stone Construction Equipment Inc 5 Maintenance ...
Page 58: ...MUD BUGGY 58 ...