40
MUD BUGGY
operation
TRANSPORTING MACHINE
When transporting unit, observe overall height for proper clearance of obstacles overhead.
Make sure bucket is lowered and latched down. Secure unit with the proper devices and in
the proper locations.
MUD BUGGY LIFTING POINTS
The unit can be hoisted with three (3) lift points under the hopper. Tilt the hopper
forward to locate the three lift loops and attach chain or straps at each of the loops as
shown below. Take up slack in chain or straps to properly balance the unit.
There are two ways of lifting the unit, from the side or from the front. Lifting the standing
platform will allow access to the fork pockets. Accessing the side fork pockets is straight-
forward.
Fork Pockets
Summary of Contents for Mud Buggy FB1000
Page 7: ...Stone Construction Equipment Inc 1 Introduction ...
Page 11: ...Stone Construction Equipment Inc 2 Technical Data ...
Page 17: ...17 MUD BUGGY Technical Data P N PLATE LOCATION SS N Plate SEngine P N ...
Page 19: ...Stone Construction Equipment Inc 3 Health Safety ...
Page 29: ...Stone Construction Equipment Inc 4 Operation ...
Page 43: ...Stone Construction Equipment Inc 5 Maintenance ...
Page 58: ...MUD BUGGY 58 ...