5
Operation
Assembling the articulated steering system
Assembling the articulated steering system
Assembling the articulated steering
system
(using the example of an E frame -
hydraulics routed underneath)
Scope of delivery
Scope of delivery for two frames:
• Figure 1: 1 x rigid tiller with two pre-assem-
bled clamping bolts. Hydraulic hose routed
underneath
• Figure 2: 1 x hinged tiller with two pre-
assembled clamping bolts. Hydraulic hose
routed underneath to connect two frames
• Figure 3: 1 x hinged tiller with two pre-
assembled clamping bolts. Hydraulic
hose routed underneath to connect the
tow tractor and a frame
• Figure 4: 2 x alignment bolts (only one
required for assembly)
• Figure 5: 1 x socket pin with the marking "5"
(see arrow) with linch pin
• Figure 6: 1 x socket pin with linch pin
• 7: 1 x tiller support (not pictured)
60
50988046101 EN - 02/2017
Summary of Contents for LiftRunner B frames
Page 1: ...Original instructions Liftrunner B frames for tugger trains 50988046101 EN 02 2017 ...
Page 2: ......
Page 6: ......
Page 7: ...1 Foreword ...
Page 14: ...1 Foreword Environmental considerations 8 50988046101 EN 02 2017 ...
Page 15: ...2 Introduction ...
Page 20: ...2 Introduction Residual risk 14 50988046101 EN 02 2017 ...
Page 21: ...3 Safety ...
Page 28: ...3 Safety Safety regulations for handling consumables 22 50988046101 EN 02 2017 ...
Page 29: ...4 Overviews ...
Page 53: ...5 Operation ...
Page 88: ...5 Operation Roadways 82 50988046101 EN 02 2017 ...
Page 91: ...Operation 5 Roadways 50988046101 EN 02 2017 85 ...
Page 93: ...6 Maintenance ...
Page 99: ...7 Technical data ...
Page 104: ...7 Technical data B frames triple loadable 98 50988046101 EN 02 2017 ...
Page 107: ......
Page 108: ...STILL GmbH 50988046101 EN 02 2017 ...