Operation
5
Assembling the articulated steering system
– Insert the hinged tiller on the second
articulated frame steering rig into the towing
jaws of the compensating hinge.
– Insert the coupling pin and lock it in place.
The illustration shows the hinged tiller with the
compensating hinge between two articulated
frame steering rigs.
The figure shows the hinged tiller when
loading and unloading is performed on the
left-hand side in the drive direction.
Removing
– Unlock the coupling pin for the compensat-
ing hinge and pull out the hinged tiller of the
rear articulated frame steering rig from the
towing jaws of the compensating hinge.
50988046101 EN - 02/2017
75
Summary of Contents for LiftRunner B frames
Page 1: ...Original instructions Liftrunner B frames for tugger trains 50988046101 EN 02 2017 ...
Page 2: ......
Page 6: ......
Page 7: ...1 Foreword ...
Page 14: ...1 Foreword Environmental considerations 8 50988046101 EN 02 2017 ...
Page 15: ...2 Introduction ...
Page 20: ...2 Introduction Residual risk 14 50988046101 EN 02 2017 ...
Page 21: ...3 Safety ...
Page 28: ...3 Safety Safety regulations for handling consumables 22 50988046101 EN 02 2017 ...
Page 29: ...4 Overviews ...
Page 53: ...5 Operation ...
Page 88: ...5 Operation Roadways 82 50988046101 EN 02 2017 ...
Page 91: ...Operation 5 Roadways 50988046101 EN 02 2017 85 ...
Page 93: ...6 Maintenance ...
Page 99: ...7 Technical data ...
Page 104: ...7 Technical data B frames triple loadable 98 50988046101 EN 02 2017 ...
Page 107: ......
Page 108: ...STILL GmbH 50988046101 EN 02 2017 ...