5
Operation
Commissioning the B frames
Manually lifting the B frames
The B frames can be moved only once they
have been lifted. For this reason, you can also
manually lift the frames if the hydraulic system
or the electrical system of the tow tractor is not
working or if the frame is not coupled to the tow
tractor.
NOTE
If a train comprising several B frames is to be
manually lifted, always begin with the rearmost
frame when viewed in the drive direction.
WARNING
Risk of injury!
Always keep a firm grip on the Lift-Tool during
operation.
The Lift-Tool must be removed again immediately
after lifting and lowering.
– Push the Lift-Tool, which is available as an
option, as far as it will go onto the lever (1)
located on the central tunnel of the frame.
– Push the Lift-Tool(2) as far as it will go in the
direction of the oben/up label. The frame is
lifted.
– To lower the frame again, push the Lift-
Tool(2) as far as it will go in the direction of
the unten/down label. The frame is lowered.
52
50988046101 EN - 02/2017
Summary of Contents for LiftRunner B frames
Page 1: ...Original instructions Liftrunner B frames for tugger trains 50988046101 EN 02 2017 ...
Page 2: ......
Page 6: ......
Page 7: ...1 Foreword ...
Page 14: ...1 Foreword Environmental considerations 8 50988046101 EN 02 2017 ...
Page 15: ...2 Introduction ...
Page 20: ...2 Introduction Residual risk 14 50988046101 EN 02 2017 ...
Page 21: ...3 Safety ...
Page 28: ...3 Safety Safety regulations for handling consumables 22 50988046101 EN 02 2017 ...
Page 29: ...4 Overviews ...
Page 53: ...5 Operation ...
Page 88: ...5 Operation Roadways 82 50988046101 EN 02 2017 ...
Page 91: ...Operation 5 Roadways 50988046101 EN 02 2017 85 ...
Page 93: ...6 Maintenance ...
Page 99: ...7 Technical data ...
Page 104: ...7 Technical data B frames triple loadable 98 50988046101 EN 02 2017 ...
Page 107: ......
Page 108: ...STILL GmbH 50988046101 EN 02 2017 ...