Operation
5
Assembling the articulated steering system
Preparation
The following section describes the procedure
for a tugger train with two frames when loading
and unloading is performed on the left-hand
side in the drive direction.
The socket pins and the alignment bolts are
pre-assembled when delivered.
The rigid tiller must be fitted between the first
frame and the second frame (see figure).
(Arrow in drive direction).
Assembling the rigid tiller
WARNING
Risk of injury through crushing!
– The frames are heavy. Never place hands or
feet underneath the raised frames.
– When raising the frame, always use appropriate
devices (wedges, wooden blocks) to prevent
rolling or tipping.
– Use only approved hardwood blocks.
– Use appropriate means (wooden blocks)
to place the frames and the rigid tiller in a
horizontal position.
50988046101 EN - 02/2017
61
Summary of Contents for LiftRunner B frames
Page 1: ...Original instructions Liftrunner B frames for tugger trains 50988046101 EN 02 2017 ...
Page 2: ......
Page 6: ......
Page 7: ...1 Foreword ...
Page 14: ...1 Foreword Environmental considerations 8 50988046101 EN 02 2017 ...
Page 15: ...2 Introduction ...
Page 20: ...2 Introduction Residual risk 14 50988046101 EN 02 2017 ...
Page 21: ...3 Safety ...
Page 28: ...3 Safety Safety regulations for handling consumables 22 50988046101 EN 02 2017 ...
Page 29: ...4 Overviews ...
Page 53: ...5 Operation ...
Page 88: ...5 Operation Roadways 82 50988046101 EN 02 2017 ...
Page 91: ...Operation 5 Roadways 50988046101 EN 02 2017 85 ...
Page 93: ...6 Maintenance ...
Page 99: ...7 Technical data ...
Page 104: ...7 Technical data B frames triple loadable 98 50988046101 EN 02 2017 ...
Page 107: ......
Page 108: ...STILL GmbH 50988046101 EN 02 2017 ...