3-15
Installation Instructions
Uncrating/Installation Instructions
P-920010-163
IMPORTANT
: If Water treatment units (Purified Water Generator
System (optional) and/or Water Softener System (optional) have to
be installed, refer to Water Treatment Systems Equipment Manual
(P-920010-187) before completing final installation of the washer.
1. Push washer to final installation site.
2. To level washer, place a spirit level on the door sill of the wash
chamber and on the side of the wash chamber (see Figure 3-4).
3. Level unit, end-to-end and side-to-side, using leveling swivel
casters. Tighten locknuts on all swivel casters.
4. Place accessory in the wash chamber.
5. If 200 under counter or 250 freestanding units, push unit against
the wall.
6. If 200 Freestanding (optional) unit, install countertop (optional)
and Freestanding Panels (optional) before pushing unit into final
position.
If 250 recessed units:
7. Fix unit in its final position as follows:
a. Fix anchoring pins on back bottom of unit, as in Equipment
Drawing.
b. Install Optional Barrier Wall Flanges.
>> Level the Unit
Final Installation
CAUTION - POSSIBLE EQUIPMENT
DAMAGE: Do not cut main electric
supply cord. The whole (105''
[2,667 mm]) length of the main sup-
ply cord is required when pulling
out the unit for service or mainte-
nance purposes.
CAUTION - POSSIBLE EQUIPMENT
DAMAGE: Do not cut flexible hose
(utilities and draining). The whole
(105'' [2,667 mm]) length of the flex-
ible hose is required when pulling
out the unit for service or mainte-
nance purposes.