Section 3 — Installation
11
Operator Manual
Reprocessing Sink
11002980_C
8. Install Lines to Pure Water Faucet and Test for Leaks
Install stainless elbow (11001069) and braided supply line (11001117) as shown using thread sealing
tape. Test connection for leaks. Any leaks need to be addressed before moving to next step.
F
Fiig
gu
urre
e 3
3--9
9.. IIn
nsstta
allll L
Liin
ne
ess tto
o P
Pu
urre
e W
Wa
atte
err F
Fa
au
uc
ce
ett
9. Mount Water Pistol and Air Gun
Mounting flanges are provided on backsplash to connect water pistol and air gun.
• Use thread seal tape on water connection.
• Connect according to workflow or in the desired configuration.
F
Fiig
gu
urre
e 3
3--1
10
0.. M
Mo
ou
un
ntt W
Wa
atte
err P
Piisstto
oll a
an
nd
d A
Aiirr G
Gu
un
n
Summary of Contents for AMSCO 30 Series
Page 2: ...2 11002980_C Reprocessing Sink Operator Manual ...
Page 4: ...4 11002980_C Reprocessing Sink Operator Manual ...
Page 6: ...vi 11002980_C Reprocessing Sink Operator Manual ...
Page 8: ...viii 11002980_C Reprocessing Sink Operator Manual ...
Page 10: ...x 11002980_C Reprocessing Sink Operator Manual ...
Page 30: ...20 11002980_C Reprocessing Sink Operator Manual ...
Page 32: ...22 11002980_C Reprocessing Sink Operator Manual ...
Page 34: ...24 11002980_C Reprocessing Sink Operator Manual ...
Page 36: ...26 11002980_C Reprocessing Sink Operator Manual ...