Section 3 — Installation
4
11002980_C
Reprocessing Sink
Operator Manual
– Steel-Toe Shoes
• Tools Required:
– Crescent Wrench
– Pipe Wrench
– Rubber Mallet
– Level
– Phillips Screwdriver
– Tape Measure
– Saw (to cut ABS tubing)
– ABS Primer/Glue
– Thread Sealing Tape
3.2 Pre-installation
The AMSCO
®
Reprocessing Sink should be moved into area intended for installation and kept 3’-4’ (914.4 - 1219.2 mm)
from walls to assemble faucets and lines. All shipping materials should be clear of working area, and boxes with
components should be opened for installation of contents. Be sure to remove all hardware before discarding packaging.
• The pre-rinse faucet(s) and DI (Deionized Water) faucet should be pre-assembled using directions from their
manufacturer.
• Use caution when handling faucets and/or working around sink as the finish can be scratched.
• Verify utility connections are located per equipment drawing specifications.
• All water and air lines need to be flushed before connecting to sink. This way no debris can damage faucet valve
seals.
CAUTION
-
POSSIBLE EQUIPMENT DAMAGE
:
Ensure there are no obstructions that will interfere with the sink's range of motion while operating the
lifting legs.
Summary of Contents for AMSCO 30 Series
Page 2: ...2 11002980_C Reprocessing Sink Operator Manual ...
Page 4: ...4 11002980_C Reprocessing Sink Operator Manual ...
Page 6: ...vi 11002980_C Reprocessing Sink Operator Manual ...
Page 8: ...viii 11002980_C Reprocessing Sink Operator Manual ...
Page 10: ...x 11002980_C Reprocessing Sink Operator Manual ...
Page 30: ...20 11002980_C Reprocessing Sink Operator Manual ...
Page 32: ...22 11002980_C Reprocessing Sink Operator Manual ...
Page 34: ...24 11002980_C Reprocessing Sink Operator Manual ...
Page 36: ...26 11002980_C Reprocessing Sink Operator Manual ...