Section 3 — Installation
16
11002980_C
Reprocessing Sink
Operator Manual
• Connect basin drains to existing floor or wall drain in accordance with applicable local code standards.
• Configure P-trap and install.
NOTE: Coupling and a nipple can be moved to opposite end of "U" piece to lower the drain outlet
F
Fiig
gu
urre
e 3
3--1
15
5.. P
P--T
Trra
ap
p c
co
on
nffiig
gu
urra
attiio
on
n a
an
nd
d IIn
nsstta
alllle
ed
d
• Test drain for leaks.
16. Verify Connections
Verify all connections (water supply, air supply, faucets, water pistol, air gun, and drains) have no leaks.
Any leaks need to be addressed before moving to next step.
Summary of Contents for AMSCO 30 Series
Page 2: ...2 11002980_C Reprocessing Sink Operator Manual ...
Page 4: ...4 11002980_C Reprocessing Sink Operator Manual ...
Page 6: ...vi 11002980_C Reprocessing Sink Operator Manual ...
Page 8: ...viii 11002980_C Reprocessing Sink Operator Manual ...
Page 10: ...x 11002980_C Reprocessing Sink Operator Manual ...
Page 30: ...20 11002980_C Reprocessing Sink Operator Manual ...
Page 32: ...22 11002980_C Reprocessing Sink Operator Manual ...
Page 34: ...24 11002980_C Reprocessing Sink Operator Manual ...
Page 36: ...26 11002980_C Reprocessing Sink Operator Manual ...