Section 3 — Installation
12
11002980_C
Reprocessing Sink
Operator Manual
10. Install Lines to Water Pistol and Air Gun and Test for Leaks
Install supply hose connection for air gun using brass elbow (11001067) and air supply line (11001119)
as shown using thread sealing tape. Test connection for leaks.
Install braided stainless-steel supply line (11001115) for water pistol, using brass coupling (11000974)
as shown. Test connection for leaks.
F
Fiig
gu
urre
e 3
3--1
11
1.. IIn
nsstta
allll L
Liin
ne
ess tto
o W
Wa
atte
err P
Piisstto
oll a
an
nd
d A
Aiirr G
Gu
un
n
11. Connect All Supply Lines
Connect all supply lines for water and air in accordance with applicable local code standards.
12. Locate Unit in Position
Move unit into position, maintaining gap from walls. Suggested 7/8” (22.225 mm) minimum from walls
for height adjustable models (AMSCO 50 Series Reprocessing Sink).
Summary of Contents for AMSCO 30 Series
Page 2: ...2 11002980_C Reprocessing Sink Operator Manual ...
Page 4: ...4 11002980_C Reprocessing Sink Operator Manual ...
Page 6: ...vi 11002980_C Reprocessing Sink Operator Manual ...
Page 8: ...viii 11002980_C Reprocessing Sink Operator Manual ...
Page 10: ...x 11002980_C Reprocessing Sink Operator Manual ...
Page 30: ...20 11002980_C Reprocessing Sink Operator Manual ...
Page 32: ...22 11002980_C Reprocessing Sink Operator Manual ...
Page 34: ...24 11002980_C Reprocessing Sink Operator Manual ...
Page 36: ...26 11002980_C Reprocessing Sink Operator Manual ...