
SSD6000-SSD6000S-SE6000D4
15
Fig.11
Fig.12
Once the generator has started and has run for a few minutes you can then apply load to the generator.
●
Ensure the equipment being used on the generator is safe to use.
●
Plug the load into the appropriate socket outlet on the generator.
●
Using the AC Voltage Selector Switch (if applicable) select the desired AC voltage.
●
Turn "OFF" the equipment and then turn "OFF" (switch down) the main MCB and RCD on the control panel.
● To stop the generator turn the key to the STOP position.
Key Switch - Stopping Operation
Deep Sea Electronics 3110 - Control Module
This range of generators have an option of a
DSE 3110
control module instead of a key switch. The DSE 3110
module is used to start/stop and monitor key elements of the engine and main AC alternator. The DSE 3110
also has an option of a remote 2-wire start function. This is ideal for "Auto" starting/stoppoing for charging
and back-up systems.
Key Switch - Starting Operation
Turn the key to the
RUN
position. The
BATTERY
and the
LOW OIL PRESSURE
red LED's will illuminate -
Fig.11
.
If any other LED's are illuminated see the
Basic Trouble Shooting-Key Switch
section in this handbook.
Turn the key to the
START
position and the starter motor should begin to crank. Once the engine has started
release the key to the
RUN
position and the generator will continue to run. The
BATTERY
&
LOW OIL
PRESSURE
red LED's should have extinguished -
Fig.12
.
Key in the
RUN
position when
the generator has started and
the engine is running.
Applying Load
●
Ensure the equipment/load being used does not exceed the total rating of the generator and has the
potential to overload the set.
●
Turn the main
MCB
and
RCD
to the
ON
position (switch up). The generator should now operate the
equipment/load plugged into it.
Key in the
RUN
position before
starting.