DOCUMENT NUMBER:
L500-912.820 ISSUE JUL 20, 2016
AMENDMENT: 00
DATE: --
CHAPTER-
PAGE 5-23
MAINTENANCE MANUAL STEMME S12
Type and Subject of Inspection
Br
eak
-in
Air
cr
af
t 100
hr
Engine 100
hr
Engine 200
hr
Engine 600 hr
Annual
Refer to
Section
Sign-off
12. Check nose-cone operation
(do not grease!).
X
X
X
7.4.13
13. Check condition, function and
smooth operation of propeller
positioning.
X
X
X
7.4.13
14. Check condition and smooth
operation of propeller brake
assy. Check propeller brake
band lining
(minimum 1.5 mm / 0.06 in).
X
X
X
7.4.13
5.4.5
CENTER FUSELAGE (EXCEPT FOR FAIRINGS)
Type and Subject of Inspection
Br
eak
-in
Air
cr
af
t 100
hr
Engine 100
hr
Engine 200
hr
Engine 600 hr
Annual
Refer to
Section
Sign-off
1. Check condition of center fu-
selage steel frame.
X
X
7.1.2.4
2. Check condition of framework
/ tail boom connection.
X
X
7.1.2.4
3. Check condition of upper and
lower connection framework /
front fuselage.
X
X
7.1.2.4
4. Check condition of control
assy. in center fuselage.
X
X
X
7.3.1
5. Check swagged terminals of
all control rods in center fuse-
lage.
X
X
7.3
6. Check flap relief gas spring
assy. for proper condition and
tight fit.
X
X
7.3.1
Summary of Contents for S12
Page 1: ......
Page 3: ......
Page 97: ......
Page 238: ......
Page 240: ......
Page 242: ......
Page 244: ......
Page 246: ......
Page 248: ......
Page 250: ......
Page 255: ...A FLIGHT CONTROLS PITCH CONTROL AND TRIM ...
Page 256: ......
Page 257: ...B FLIGHT CONTROLS LATERAL CONTROL WING FLAP AILERON ...
Page 258: ......
Page 259: ...C FLIGHT CONTROLS AIRBRAKE CONTROL ...
Page 260: ......
Page 261: ...D FLIGHT CONTROLS RUDDER CONTROL ...
Page 262: ......
Page 263: ......
Page 264: ......
Page 265: ...E PROPULSION SYSTEM ...
Page 266: ......
Page 268: ......
Page 270: ......
Page 272: ......
Page 274: ......
Page 276: ......
Page 278: ......
Page 280: ......
Page 282: ......
Page 284: ......
Page 286: ......
Page 288: ......
Page 290: ......