
3
#10-32 x 1/2" PAN HEAD SHOULDER SCREW
PHILLIPS SQUARE DRIVE
QTY 4 PER CASE
NOTICE: Do not exceed
40 in-lbs of torque.
Page 26 of 27
939501617 Rev V
Tethering to a c:scape Beam
Note: Two persons are recommended
for this assembly.
1.
Measure distance “A” to determine the
proper tether bracket holes to use, per the
chart below, then remove knockouts.
2.
Remove the 6” lateral box drawer if
present (see page 6), or the second 12”
tower drawer from the floor (see page 7).
3.
Secure the tether brackets with the
screws and lock nuts as shown.
4.
With the case close to the level beam,
adjust the height of the case so that the
tether bracket just fits under the beam,
and the case is level.
1-1/2 High Unit
TETHER BUTTON
NOTICE: Do not push
until tether bracket
has been assembled
to the storage unit.
Distance “A”
24” - 24-5/8”
24-5/8” - 25-1/4”
25-1/4” - 26”
Holes
Bottom
Middle
Top
Adjusting Glides from
Exterior of Case
Glide Adjustment
“A”
TOP
MIDDLE
BOTTOM
KNOCKOUTS
LOCK NUTS
#10-32
STORAGE TO BEAM
TETHER BRACKET
1
LEVEL
C:SCAPE BEAM
SIDE VIEW
4