1. DIP switch positions 8 through 10 on the control panel are used for direct connect network
BUS termination. When a panel is located at the end of a direct connect BUS and it does
NOT have a repeater connected, DIP switches 8, 9 and 10 must be ON. When a panel is
not direct connected to other panels, but a repeater is used to network the panel, its DIP
switches 8, 9, and 10 must be ON. Otherwise, DIP switches 8, 9 and 10 are always OFF.
2. Jumper J1 on the network repeater is always CLOSED. Newer designs have this jumper
permanently CLOSED. On older designs you had to physically install the jumper
CLOSED.
3. Jumpers J2 and J3 for the network repeater should be present (jumper is CLOSED) only
when a twisted pair is connected to Port 1 of terminal block TB1. Jumpers J2 and J3 are
used to enable earth ground fault monitoring at Port 1 of terminal block TB1.
4. It is a requirement that an insulated wire be run between the network repeater terminal G
(TB2) and an earth grounding screw at the control panel for all network repeater
installations.
The following text details how the panel and repeater terminators must be set
for the network example in Figure 5-9.
Panel 1 is at the end of a direct connect BUS and it does not have a repeater, so its DIP
switches 8, 9 and 10 must be ON to provide direct connect BUS termination.
Panel 2 is NOT at the end of a direct connect BUS so its DIP switches 8, 9 and 10 must be
OFF.
Note:
A repeater would not be allowed to be connected to panel 2 in this example because it is not at the end
of a direct connect BUS.
Panel 3 looks like it is at the end of a direct connect BUS, but because it has a repeater
connected to it, DIP switches 8, 9 and 10 at panel 3 must be OFF. The direct connect BUS
termination is provided by the repeater through jumper J1. Recall that jumper J1 must placed
(CLOSED) as this is the rule for ALL repeaters. Jumpers J2 and J3 on the repeater of panel 3
must be OPEN because no wires are connected to the repeater twisted pair terminals 1 and 2
of TB1.
Panel 4 is not directly connected to other panels but it is effectively direct connected to its
repeater which electrically behaves the same as a direct connected BUS between panels.
Because panel 4 is connected only to its repeater its DIP switches 8, 9 and 10 at panel 4 must
be ON to provide direct connect BUS termination. Jumper J1 of the repeater must also be
placed (CLOSED) to provide the other direct connect BUS termination and because the rule
for repeaters is that Jumper J1 must always be placed (CLOSED). Repeater jumpers J2 and J3
must be placed (CLOSED) because a wired twisted pair is connected to terminals 1 and 2 of
TB1. Connecting these jumpers enables earth ground fault monitoring of the twisted pair wire
Summary of Contents for SCSS-700
Page 2: ......
Page 12: ...SCSS 700 Installation Manual 8...
Page 22: ...Model SCSS 700 Installation Manual 1 10 53722...
Page 26: ...Model SCSS 700 Installation Manual 2 4 53722...
Page 31: ...Before You Begin Installing 53722 3 5 Figure 3 1 Wire Routing Example...
Page 42: ...Model SCSS 700 Installation Manual 3 16 53722...
Page 92: ...Model SCSS 700 Installation Manual 4 50 53722...
Page 148: ...Model SCSS 700 Installation Manual 8 26 53722...
Page 192: ...Model SCSS 700 Installation Manual 9 44 53722...
Page 250: ...SCSS 700 Installation Manual A 14 53722...
Page 254: ...Cut Along the Dotted Line...
Page 256: ......
Page 257: ......