IGL15 Spare parts replacement manual
Version
:
S2018.05
2
1.
Preface
1.1. Safety Declaration
Only qualified personnel are allowed to perform any planning, installation
or maintenance work to GTW7 series gearless PMS elevator traction machines.
The personnel must be trained for the job and must be familiar with the
installation, assembly, commissioning and operation of the product. Sufficient knowledge in lift
construction is essential. Their commissioning is prohibited until the requirements of the directive
are satisfied by or upon integration of the motor into the final product.
The regulations concerning operation, maintenance and inspection in accordance with the
applicable safety regulations in lift construction such as GB 7588-2003 “Safety rules for the
construction and installation of electric lifts” (equal to EN81-1: 1998) and other relevant.
Regulations shall be strictly observed.
The operator is responsible for the proper installation of the gearless PMS elevator traction
machines with regard to safety requirements as well as for its inspection and maintenance as
specified in the applicable regulations. No liability can be assumed for any damage caused by
improper handling or any other acts, which are not in conformity with these operating instructions
and thus deter from the qualities of the product.
1.2. IGL15 traction machine spare parts list
NO.
Part No.
Name
QTY
Remark
1
IGL15.1.1-1
Traction Wheel
1
2
ERN1387
OIH100
Encoder
1
Selectable
3
Bearing
GT/T276
Bearing 6213-2RS
1
Main Shaft
Bearing
4
Bearing
GB/T276
Bearing 6317-2RS/C3
1
Main Shaft
Bearing
5
GTW7.2.1
FZD10 Brake
2
Brake
6
GTW7.2.1.1
Brake Piece part
2
7
KCB_R-5
Basket Switch
1
For Hand Wheel