Place all parts from the box in a cleared area and position them on the floor in front of you. Remove
all packing materials from your area and place them back into the box. Do not dispose of the
packing materials until assembly is completed. Read each step carefully before beginning. If you
are missing a part please call our toll-free number for assistance
1-800-375-7520
or e-mail us at
ASSEMBLY INSTRUCTIONS
7
NOTE:
Assembly of the tower unit requires two people.
STEP 1:
To assemble the
TOP PULLEY ASSEMBLIES
onto the top of the
UPRIGHT FRAME(11)
by
attaching the
RIGHT
and
LEFT TOP CONNECTORS(12, 13)
to the
UPRIGHT FRAME(11)
with
SOCKET
HEAD BOLTS(M12x1.75x80mm)(143)
and
WASHERS(M12xø24x2mm thick)(341).
NOTE:
The
ROPES(211)
must be centered through the
TOP CONNECTORS(12, 13)
to prevent the
ROPES(211)
from rubbing.
STEP 2:
There are several ties on the ropes to keep the ropes in place during shipping. Use scissors to
cut the ties. Be careful, do not damage the ropes.
STEP 3:
Remove the
WEIGHT SHROUD(15)
by unscrewing the
BUTTON HEAD BOLTS(M6x1x12mm)
(146)
from the
UPRIGHT FRAME(11)
and the
MAIN BASE(1)
.
Ties
Ties
Although the product included basic tools for assembly, we recommend to use your own tools for
assembly if it is available. Use the tools such as socket set, wrenches, and screwdriver.
Summary of Contents for 55-6510A
Page 28: ...PRODUCT PARTS DRAWING 28 BACK...
Page 29: ...29 FRONT...
Page 36: ...NOTES 36...
Page 37: ...NOTES 37...