Positioning the cabinet
10
Operation 10
Chiller dimensions
11
installation Procedure
12
Step A - Place Dispenser into the hole in the bench
12
Step B - Connect drain hose
12
Step C - Mount Control Unit and connect Control to Pump cable
12
Step D - Connect fluid product lines to Chiller
13
Step E - Connect fluid product lines inside Chiller
13
Step F - Connect Data cables
13
Step G - Fix Dispenser in place
14
Step H - Commissioning Freepour
14
Step I - Assess Chiller drain plug
14
Before first service
14
optional procedures
14
Changing the Dose Time
14
Changing the Flow Rate
15
Changing the product type badges
15
3. oPerAting FreePour
16
operating Modes
16
On 16
Manual backup
16
bladders 16
Handling bladders
16
daily setup Procedure
17
operating Freepour - during service
18
dispensing product
18
reloading during service
18
Reloading a 'Connect 4' Chiller
18
Reloading a 'Connect 8' Chiller
18
blanking 18
operating Freepour - After service
19
daily Cleaning routine
19
Leaving Freepour overnight
19
Contents
l
3
tAbLe oF Contents
About this guide
1
hACCP 1
iMPortAnt inForMAtion
4
safety First!
4
Cleaning 5
refrigeration 5
Airflow 5
Lifting
5
environment
5
ALLergen AdViCe
5
1. ProduCt oVerView
6
system Components
6
Services required on site
6
overview 7
basic dosing Functions
7
Manual dispense
7
Dose Time
7
Automatic Reverse Flow
7
2. instALLAtion oVerView & ProCedure
8
Planning the dispense station
8
General layout
8
Maximum permissible distances
8
Freepour dispenser and Control unit
9
Positioning the Dispenser
9
Dispenser dimensions
9
Bench cut-out dimensions
9
Control Unit dimensions
9
Under bench clearance
9
Freepour Chiller
10
Operating temperature range
10
Locating the cabinet
10
Contents
2
l
Summary of Contents for Freepour
Page 16: ......