April 30, 2014
1
912-275 PYRAMID ROOF
INSTALLATION INSTRUCTION
INSTALLATION DETAILS
Recommended crew (Adult)
: 2
Installation time
: 1 hr (2 man hrs)
User age
: 2-12
Use zone
: NA
Weight
: 92 lbs
SURFACING: Use of safety surfacing in compliance with
ASTM specification F1292 is required.
MAINTENANCE:
As the owner of the playground you are responsible for
maintenance of the equipment and play area. A
maintenance schedule must be developed and the
equipment inspected frequently. A maintenance section
that includes component specific maintenance
requirements is included at the end of this manual.
Be sure to inspect surfacing for foreign objects that could
cause injury and that sufficient surfacing is in place in
accordance with ASTM and CPSC standards.
Summary of Contents for QUICK SHIP UNIT 1 STANDARD
Page 1: ... 0 1 2 0 3 4 5 1 6 6 789 5 4 1 1ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI8 ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...QUICK SHIP 1 STANDARD Installation Guide ...
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 35: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Page 48: ...March 20 2014 4 922 118 3 U CLIMBER 3 DECK INSTALLATION INSTRUCTION ...
Page 79: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Page 80: ......
Page 86: ......