Value Series
Installation Guide
2/28/11 V-C_OUTLINE.V1.0211
19
Direct Bolt Deck
While two people position and hold the deck in place, insert the
deck bolt and washer through the deck and into the factory installed
nut on the post.
To ensure proper placement, refer to the layout drawing and the
post id drawing at the beginning of this guide.
Summary of Contents for QUICK SHIP UNIT 1 STANDARD
Page 1: ... 0 1 2 0 3 4 5 1 6 6 789 5 4 1 1ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI8 ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...QUICK SHIP 1 STANDARD Installation Guide ...
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 35: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Page 48: ...March 20 2014 4 922 118 3 U CLIMBER 3 DECK INSTALLATION INSTRUCTION ...
Page 79: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Page 80: ......
Page 86: ......