March 10, 2014
6
912-242 SQUARE DECK 46”
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__6)
Once the concrete has set
, back fill dirt over the footing
holes; inspect the area and components for tools, hazardous debris
and sharp edges. Verify all components are installed and all
hardware is tight and then install the safety surfacing.
__7)
inspect the components:
for sharp edges and if necessary
file them down and apply touch up paint
Summary of Contents for QUICK SHIP UNIT 1 STANDARD
Page 1: ... 0 1 2 0 3 4 5 1 6 6 789 5 4 1 1ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI8 ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...QUICK SHIP 1 STANDARD Installation Guide ...
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 35: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Page 48: ...March 20 2014 4 922 118 3 U CLIMBER 3 DECK INSTALLATION INSTRUCTION ...
Page 79: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Page 80: ......
Page 86: ......