
4
CL & PSL50 Series
SERVICE OVERVIEW
Semi-annual service tasks
The service tasks listed below are to be done on an annual basis to guarantee good
dispenser functionality and maintain warranty compliance. Step-by-step instructions
are provided on the following pages.
• Clean canisters, canister outlets
• Clean spout adaptor, mixers, Black Coffee Kit
• Clean air channel, replace air filters
• Clean espresso brewer
• Reassemble espresso brewer
• Clean monobrewer
• Reassemble monobrewer
• Clean bean hopper
• Clean grinder, replace outlet
• Clean dispenser interior
• Reinstall bean hopper
• Reinstall air channel and filters
• Reinstall spout adaptor, mixers, Black Coffee Kit
• Reinstall canisters
• Reinstall espresso brewer
• Reinstall monobrewer
Semi-annual service required equipment
The following cleaning equipment/consumable items are required to perform the
semi-annual service tasks.
• Door key
• Cleaning cloth/sponge
• Mild kitchen cleaning spray
• Service access code (available from the service technician or distributor)
• Air filter material (PN10034178)
• Grinder outlet* (one per grinder - PN10031032)
Items marked with a “*” are only required if the dispenser is equipped with the
applicable system.
Important:
The Semi-annual Service (6 month service tasks) shall only be performed by
a trained technician using all required safety equipment as outlined during the
training session(s) and service kits from the original equipment manufacturer.
Summary of Contents for CL Series
Page 1: ...SpenglerTT_SM_EN Part No 10037114_03 CL PSL50 SERIES SERVICE MANUAL ...
Page 36: ...36 CL PSL50 Series Hydraulic diagram PSL50 ES12B SCHEMATICS ...
Page 37: ...37 CL PSL50 Series Hydraulic diagram PSL50 ES13 SCHEMATICS ...
Page 38: ...38 CL PSL50 Series Hydraulic diagram PSL50 FBT14 SCHEMATICS ...
Page 39: ...39 CL PSL50 Series Hydraulic diagram CL22 SCHEMATICS ...
Page 40: ...40 CL PSL50 Series Electrical diagram PSL50 series SCHEMATICS ...
Page 41: ...41 CL PSL50 Series Electrical diagram PSL50 series continued SCHEMATICS ...
Page 42: ...42 CL PSL50 Series Electrical diagram PSL50 series continued SCHEMATICS ...
Page 43: ...43 CL PSL50 Series Electrical diagram CL series SCHEMATICS Matchline ...
Page 44: ...44 CL PSL50 Series Electrical diagram CL series continued SCHEMATICS Matchline ...
Page 45: ...www creminternational com ...