31
CL & PSL50 Series
REASSEMBLY
Step 18: Reinstall canisters
Clip the chutes back onto the canister
outlets (keep the outlets pointed up
for now).
01
Replace the canister(s) into the
correct location(s). Make sure that the
canister alignment pin is fitted into the
canister shelf and sitting flush inside
the dispenser.
Rotate the canister chute(s) down so
that they point directly into the mixer
bowl(s). Then rotate the canister
lock(s) so they point straight down.
02
04
Summary of Contents for CL Series
Page 1: ...SpenglerTT_SM_EN Part No 10037114_03 CL PSL50 SERIES SERVICE MANUAL ...
Page 36: ...36 CL PSL50 Series Hydraulic diagram PSL50 ES12B SCHEMATICS ...
Page 37: ...37 CL PSL50 Series Hydraulic diagram PSL50 ES13 SCHEMATICS ...
Page 38: ...38 CL PSL50 Series Hydraulic diagram PSL50 FBT14 SCHEMATICS ...
Page 39: ...39 CL PSL50 Series Hydraulic diagram CL22 SCHEMATICS ...
Page 40: ...40 CL PSL50 Series Electrical diagram PSL50 series SCHEMATICS ...
Page 41: ...41 CL PSL50 Series Electrical diagram PSL50 series continued SCHEMATICS ...
Page 42: ...42 CL PSL50 Series Electrical diagram PSL50 series continued SCHEMATICS ...
Page 43: ...43 CL PSL50 Series Electrical diagram CL series SCHEMATICS Matchline ...
Page 44: ...44 CL PSL50 Series Electrical diagram CL series continued SCHEMATICS Matchline ...
Page 45: ...www creminternational com ...