28
CL & PSL50 Series
Replace bean hopper in position above
grinder and reinstall retaining screw.
01
Step 15: Reinstall bean hopper
SERVICE TASKS
Pro Tip:
Be sure the grinder soft ring
is placed flat and evenly on
top of the grinder inlet before
reinstalling the bean hopper. A
missing or misaligned soft ring
will prevent sealing of the hopper
to the grinder and cause a large
mess inside the dispenser.
Open bean gate to restore flow (push
in for some models, pull out for
others).
02
Summary of Contents for CL Series
Page 1: ...SpenglerTT_SM_EN Part No 10037114_03 CL PSL50 SERIES SERVICE MANUAL ...
Page 36: ...36 CL PSL50 Series Hydraulic diagram PSL50 ES12B SCHEMATICS ...
Page 37: ...37 CL PSL50 Series Hydraulic diagram PSL50 ES13 SCHEMATICS ...
Page 38: ...38 CL PSL50 Series Hydraulic diagram PSL50 FBT14 SCHEMATICS ...
Page 39: ...39 CL PSL50 Series Hydraulic diagram CL22 SCHEMATICS ...
Page 40: ...40 CL PSL50 Series Electrical diagram PSL50 series SCHEMATICS ...
Page 41: ...41 CL PSL50 Series Electrical diagram PSL50 series continued SCHEMATICS ...
Page 42: ...42 CL PSL50 Series Electrical diagram PSL50 series continued SCHEMATICS ...
Page 43: ...43 CL PSL50 Series Electrical diagram CL series SCHEMATICS Matchline ...
Page 44: ...44 CL PSL50 Series Electrical diagram CL series continued SCHEMATICS Matchline ...
Page 45: ...www creminternational com ...