
15
CL & PSL50 Series
Step 4: Reassemble espresso brewer
Insert espresso outlet so tube points
away from the centre of brewer to
align retaining nib to release position,
then push it into brewer cover and
rotate it 180° to lock it in place. Set
aside.
Slide grounds pusher into its track
and push it back until it just extends
past the back of the brewer.
Fit brewer cover into guide slots
(when correctly aligned brewer cover’s
outlet tube orifice will be pointing to
right - when viewed brewer from front
- brewer cover cannot be successfully
installed backwards).
Slide cake pusher and brewer cover
towards each other so that cake
pusher’s guide nibs align into brewer
cover’s corresponding slots and then
push brewer cover down until it is
fully seated to brewer.
02
01
03
04
SERVICE TASKS
Summary of Contents for CL Series
Page 1: ...SpenglerTT_SM_EN Part No 10037114_03 CL PSL50 SERIES SERVICE MANUAL ...
Page 36: ...36 CL PSL50 Series Hydraulic diagram PSL50 ES12B SCHEMATICS ...
Page 37: ...37 CL PSL50 Series Hydraulic diagram PSL50 ES13 SCHEMATICS ...
Page 38: ...38 CL PSL50 Series Hydraulic diagram PSL50 FBT14 SCHEMATICS ...
Page 39: ...39 CL PSL50 Series Hydraulic diagram CL22 SCHEMATICS ...
Page 40: ...40 CL PSL50 Series Electrical diagram PSL50 series SCHEMATICS ...
Page 41: ...41 CL PSL50 Series Electrical diagram PSL50 series continued SCHEMATICS ...
Page 42: ...42 CL PSL50 Series Electrical diagram PSL50 series continued SCHEMATICS ...
Page 43: ...43 CL PSL50 Series Electrical diagram CL series SCHEMATICS Matchline ...
Page 44: ...44 CL PSL50 Series Electrical diagram CL series continued SCHEMATICS Matchline ...
Page 45: ...www creminternational com ...