DF/FF MANUAL 118002-001 R
ev B
2
INSPECTION & INSTALLATION
Initial inspection and preliminary
checkout procedures are recommended.
For safe operation, please follow the
step-by-step procedures described in
Chapter 3, Operating Instructions.
2.1
INITIAL INSPECTION
Inspect the package exterior for evidence
of damage due to handling in transit.
Notify the carrier and Spellman
immediately if damage is evident. Do
not destroy or remove any of the packing
material used in a damaged shipment.
After unpacking, inspect the panel and
chassis for visible damage.
Fill out and mail the Warranty
Registration card accompanying the unit.
Standard Spellman DF/FF High voltage
power supplies and components are
covered by warranty. Custom and
special order models (with an X suffix in
the model number) are also covered by
warranty.
2.2
MECHANICAL
INSTALLATION
Units in the DF/FF series have front
panel holes for standard EDI rack
mounting. The rack must allow rear
access for cable connections. Units are
fully enclosed and are suitable for bench
or tabletop operation. Standard unit
dimensions are shown in Figure 2.1. It is
strongly recommended to support the
chassis by guides or slides. Slides are
available for ease of servicing of the
internal assemblies (SL option).
Summary of Contents for X3645
Page 1: ...DF FF MANUAL 1 118002 001 Rev B ...
Page 2: ...DF FF MANUAL 2 118002 001 Rev B ...
Page 28: ...DF FF MANUAL 118002 001 Rev B ...
Page 29: ...DF FF MANUAL 118002 001 Rev B ...
Page 30: ...DF FF MANUAL 118002 001 Rev B ...
Page 31: ...DF FF MANUAL 118002 001 Rev B ...
Page 32: ...DF FF MANUAL 118002 001 Rev B ...
Page 33: ...DF FF MANUAL 118002 001 Rev B ...
Page 34: ...DF FF MANUAL 118002 001 Rev B ...
Page 35: ...DF FF MANUAL 118002 001 Rev B ...
Page 36: ...DF FF MANUAL 118002 001 Rev B ...
Page 37: ...DF FF MANUAL 118002 001 Rev B ...
Page 38: ...DF FF MANUAL 118002 001 Rev B ...
Page 39: ...DF FF MANUAL 118002 001 Rev B ...
Page 40: ...DF FF MANUAL 118002 001 Rev B ...