12.7

 

Cooling 

From  now  on,  it  is  essential  that  you  work  in  absolutely  sterile  conditions,  as  any 
contamination  through  bacteria  in  the  air  or  through  unclean  devices  during  all 
subsequent work steps could lead to all your work being in vain. All devices used must 
be  thoroughly  cleaned  or  disinfected.  Please  see  the  notes  in  the  chapter  “Notes  on 
hygiene”. After connecting the cooling jacket to a cold water source (cold tap water), 
we recommend to use the “whirlpool effect” in order to settle the hot trub. This effect 
causes  the  trub  substances  that  are  contained  in  the  wort  to  sink  to  the  bottom, 
resulting in a clearer wort.  
 
 

Connect the hoses and position the valves as seen 
in the illustration on the left-hand side. Selecting 
a low pump speed (set to 6-8) ensures a consistent 
rotation  of  the  wort  inside  the  vessel.  Caution: 
The  pump  will  only  restart  again  at  86°C.  The 
consistent  rotation  will  also  optimise  the  cooling 
process.  Cooling  the  liquid  from  100°C  to 
approx.  25°C  (if  using  ice-cold  water)  requires 
approx. 50 min/120 min. 

 

During  the  cooling  process,  this  trub  slowly 
settles  on  the  base  of  the  container,  where  it 

remains  once the  clear  wort  is  drained. Avoid stirring or moving the  cooled wort,  as 
this  will  cause  the  settled  trub  to  whirl  up  again  and  also  flow  into  the  fermentation 
vessel. Caution: First, the water at the outlet of the wort cooler is still close to boiling 
temperature (scalding risk). This water can be re-used for cleaning activities at a later 
stage. It is especially important to cool the wort quickly between 40° and 20°, as it is 
particularly  susceptible  to  infection  at  this  range.  Once  the  wort  has  cooled  to  20°C, 
pump  the  wort  into  a  suitable  vessel.  However,  prior  to  this,  4-8%  wort  (8-16  L  for 
200  L,  bottom-fermented  beer  approx.  4%,  top-fermented  beer  up  to  8%)  must  be 
drawn  off  into  a  lockable  vessel  and  stored  in  a  cool  room.  This  is  added  to  the 
fermented beer at a later stage, so as to achieve secondary fermentation and sufficient 
formation  of  carbon  dioxide  in  the  filled  bottles  or  barrels.  From  Braumeister  500  L 
we  recommend  the  pre  cooling  of  the  wort  from  100°C  down  to  approx..  60°C  with 
the  cooling  jacket  of  the  Braumeister  and  the  cooling  down  to  the  fermentation 
temperature by an adequate plate chiller. 

 
Use  a  suitable  clean  hose  for  bottling.  The  hose 
connection and the position of the valve can be seen in the 
illustration  on  the  left-hand  side  (Caution:  If  the  hose  is 
sloping  and  the  valve  is  open,  the  wort  drains 
immediately!). Now, switch the pump  to ‘Manual’ mode 
(in  order  to  switch  to  ‘Manual’  mode  press  the  first  and 
second  button  on  the  left  simultaneously);  this  makes  it 
easier to pump out the wort.  
At  first,  use  the  speed  controller  to  pump  at  high  speed; 
reduce  the  flow  rate  later  in  order  to  minimise  the 
drainage of the trub substances.  
 

 

 

Summary of Contents for Braumeister 1000 L

Page 1: ...Translation from the German Original Operating manual brewing instructions Speidels Braumeister Item No 45200 46500 4100 Issue October 2018...

Page 2: ...ner lid 10 11 5 Information pertaining to the piping layout and the position of the valves 10 11 6 Lifting equipment information 10 11 7 Notes on hygiene 11 11 8 Information about the cooling jacket a...

Page 3: ...st satisfaction and has a long lifespan Conformity declaration SPEIDEL Tank und Beh lterbau GmbH hereby declares that the Braumeister product mentioned in these instructions and to which this declarat...

Page 4: ...ensation on the underside of the lid flows back into the container For this hold the lid over the container at an angle Scalding risk The Braumeister always operate via a residual current circuit brea...

Page 5: ...and scope of delivery Please refer to the following illustration for components and scope of delivery Note The following illustrations refer to Braumeister 200 L however the instruction for the Braume...

Page 6: ...with speed control Power connection 400V Min fuse protection 32 Amp Total connection 18 4 kW Cooling system Double walled shell area 1 8m plus cooling spiral included in delivery Contents Brewing qua...

Page 7: ...aning process Once in a while hoses pipes must be removed and cleaned using a separate brush When cleaning the brewing vessel ensure water spray or moisture does not comes in contact with the electric...

Page 8: ...es Hoisting equipment Visual inspection for damage According to hoisting equipment instructions Geared winch for tilted position Item No 78030 Lubrication according to separate instructions Hoses Item...

Page 9: ...g recipe The arrow keys allow you to modify any entries Use the Select key to move to the next recipe item until you have reached the end Once all items of the recipe have been acknowledged by pressin...

Page 10: ...pump s pressure gauge during the mash process In order to prevent excessive pressure in the malt pipe a pressure of 0 2 bar or 0 15 bar must not be exceeded The pump output is limited to approx 0 25 b...

Page 11: ...ew drops or a little residue of the sulphurous acid in the beer is completely harmless Storage and maturation vessels are disinfected in the same way as fermentation vessels Where the beer is filled i...

Page 12: ...beer enjoyed by gentlemen and ladies 12 2 Preparations Procuring the ingredients Organise the required brewing ingredients hops malt and yeast in good time Ensure that the malt is fresh After crushing...

Page 13: ...the menu bar You may program up to 5 resting periods If a resting period is not required simply program it with 0 minutes Three batches of hops with the same time before the end refers to the time of...

Page 14: ...ignal will be sounded and the lights will be blinking This must be acknowledged by pressing the Select button This switches the pump off Now follow the instructions on the brew control The malt pipe c...

Page 15: ...protein rest the large protein molecules in the malt are split into small components Protein rest is important for purification and full body but especially for foam stability and carbon dioxide bind...

Page 16: ...ownish red or yellow sufficient saccharification has taken place Where this is not the case the last temperature level must be maintained for a longer period 12 5 Purification After completion of the...

Page 17: ...nd the temperature of this phase As the target temperature of 100 C cannot always be reached timing starts after a waiting period of 5 minutes without increase in temperature When pressing the Select...

Page 18: ...m of pellets or dried hop blooms only in a hop bag The bitter substance content in beers is indicated in bitter units BU and is around 10 20 BU in wheat beers and 25 45 BU in Pilsners The bitter subst...

Page 19: ...the fermentation vessel Caution First the water at the outlet of the wort cooler is still close to boiling temperature scalding risk This water can be re used for cleaning activities at a later stage...

Page 20: ...r is started by the activity of beer yeast organisms which causes the fermentable sugar to be converted into alcohol and carbon dioxide After adding the yeast immediately seal the container with a lid...

Page 21: ...ored and cooled wort to the unmatured beer in the fermentation vessel Do this 1 2 hours prior to the bottling stage This allows whirled up trub to settle again Attach a pipe that reaches the base of t...

Page 22: ...Braumeister and store it in a suitable place Install power supply and provide hoses for fresh water and drain water Also clean all additional equipment required such as malt shovel wooden spoon wort h...

Page 23: ...cycle has begun The next brewing phases take place fully automatically as programmed During some of the brewing phases the control causes a short pump break to reposition the malt The display shows t...

Page 24: ...batch of hops 100 g or 150 g or 300 g in order to clear the wort from the hot trub and to ensure a rapid cooling process use a hos to connect the pump to the drain valve see detailed instructions To...

Page 25: ...Speidels Braumeister Page 25 of 32 Cheers Additional recipes can be found here www speidels braumeister de...

Page 26: ...does not start Check whether pump is operating and vented Check even positioning of malt pipe on vessel base and proper sealing Wort flows too slowly or not at all during purification Use wooden spoon...

Page 27: ...e with notification prior to starting the first brewing procedure The following is stipulated in the Ordinance on the Implementation of the German Beer Tax Law BierStV and applies only to German hobby...

Page 28: ...rt content measurement Plato Litres TARGET wort content measurement Plato Litres Wort boiling Total duration 1 Hop addition 2 Hop addition 3 Hop addition Filtering Cooling Wort removal Bottling Wort c...

Page 29: ...add water until the heating coils are submerged several centimetres below the water level Now heat the water to 30 C During this process the water is recirculated Add a small amount of Halapur alkali...

Page 30: ...ray the Braumeister with water Electrical components must come in contact with water When cleaning the exterior of the Braumeister ensure to disconnect the power Best cleaning results can be achieved...

Page 31: ...ear of the device Guarantee claims are also excluded in terms of brittle components or expendables such as seals or similar Finally guarantee claims are excluded where work is performed on the device...

Page 32: ...rst r behaga dig s kontakta din lokala terf rs ljare da Hvis anvisningerne ledsager v re p et sprog de forst r s du bedes kontakte din lokale forhandler it Se le istruzioni che accompagnano in una li...

Reviews: