Speidels Braumeister
Page 3 of 32
1
General information
Dear customer,
You have purchased a new device from our company. Thank you for your trust in our
product. Quality and functionality of our products rate high on our list of priorities.
Please read the user guide before the first use completely and make this any user of the
master brewer accessible.
Use according to intended purpose:
The Braumeister is designed and produced to brew beer in quantities of approx. 200 L or
500 L
or 1000 L. Prior to each brewing procedure, a safety inspection must be performed
for your safety and proper functionality of the Braumeister.
Operating instructions:
These operating and brewing instructions have been compiled to ensure reliable and safe
commissioning and operation of the Braumeister right from the start. Please read the
instructions carefully and in full before brewing your first beer. Compliance with these
notes and instructions will ensure that your Braumeister operates to your utmost
satisfaction, and has a long lifespan.
Conformity declaration:
SPEIDEL Tank- und Behälterbau GmbH hereby declares that the “Braumeister” product
mentioned in these instructions, and to which this declaration applies, complies with the
requirements of the European guidelines.
Manufacturer
Speidel Tank- und Behälterbau GmbH
Krummenstraße 2
72131 Ofterdingen
Germany
www.speidels-braumeister.de
www.speidel-behaelter.de
2
Safety instructions
2.1
General safety notes
The Braumeister consists nearly completely of stainless steel (electrically conductive).
The equipment is categorised as protection class 1 (protective earthing).
In operation
the connection of a protective conductor is imperative.
The device and mains cable must be inspected regularly for any signs of damage. In
the event of signs of damage,
do not use the device!
Always disconnect the plug from the socket (pull the plug, not the cable) if you no
longer wish to use the device, for cleaning or in the event of a fault. Only properly a
trained electrician shall be permitted to perform maintenance and repair work. The
terminals may still be live after the equipment has been shut down. Wait at least 3
minutes.
Risk of electric shock!