Step 1:
Using a post-hole digger, dig a 700 mm
deep hole then round the top of the
hole.
Step 2:
Check that the front of the pole is
facing in the direction of the area you
wish to monitor. To ensure this, align
the pole such that the two top holes on
the side are perpendicular to the area
you wish to view. This is done so that
the winch faces the right way. Using a
spirit level on 2 sides check that the
pole is vertical.
Step 3:
Once the pole is levelled,
pour 2 or 3 bags
of KwikSet
concrete into the hole; proceed to pour 4.4L (2.2L per
20kg) of water into the hole, then stir the concrete using
a spade or pick. Shovel dirt on top of the concrete to
flatten out the area and to hide the concrete.
Step 4:
Wait 10 – 15 minutes or until set before proceeding to the
Winch Vertical Pole section.