Spectur Guide for STA6 Installation
1300 802 960 | www.spectur.com.au
19
Other Base Options
Mobile Base installation
What you need:
Step 1:
Place pole in the middle of the base as shown below. Then using the 3 M15x140 bolts
provided, secure the pole with a washer on each side of the frame, followed by a nut.
○
2 x sheet metal covers.
○
4 x Triangular metal sheets
○
2 x Pole supports.
○
4 x base supports.
○
2 x M15x25 bolts
○
2 x M15x15 nuts
○
20 x 12-14x35 Tek screws
○
Socket set.
○
20 x Tec screws
○
Socket set for the above bolts
○
3 x M15x140 bolts
○
10 x M15 washers
○
2 x M15x25 bolts
○
4 x M15x30 bolts
○
4 x Base support plates
○
2 x M15x12 nuts
○
20 x 20kg sandbags
○
Mounting pole drilled for
mobile base.
○
Drill + Philips head
Commented [GP8]:
Put these sections below winch
section. That is, finish one compete install and then talk
about other base options
Commented [GP9]:
How is base assembled before this
step
Commented [MD10R9]:
This is the condition the base
comes in, but I will do a full assembly of the base when
available
Commented [MD11R9]: