72
Spectra Watermakers Commissioning Report –
Page 1
(To be completed by authorized installer)
Fill out the below checks as completely as possible. Check any boxes that apply and note any concerns.
PURGE
□
Storage Chemicals have been purged with PRV open
Length of purge: _______Minutes
□
Diversion Valve is up, in reject position
RUN HIGH MODE CHECKS
Product Flow: _____________ GPH/LPH
Confirmed Product Flow Rate ___________GPH/LPH
□
Technician Flow meter. Brand________________
□
Hand Measurement _______Gal/Liters in _____SEC/MIN
Product Quality: __________ PPM
□
Confirmed product quality with handheld TDS meter
Feed Pressure: __________ PSI/BAR
Brine Flow Rate: _______________ GPM/LPM
Measurement taken with:
□
Technician Flow meter. Brand_________________
□
Hand Measurement: _______Gal/Liters in _____SEC/MIN
Notes:_________________________________________________________________
______________________________________________________________________
FRESHWATER FLUSH
□
Freshwater Flush solenoid valve opens
When seacock is open, what is the ppm of brine discharge at the end of the flush_______
Flush duration is ________Minutes
□
Needed to change flush time
Notes:________________________________________________________________
______________________________________________________________________
*If the system does not have a dedicated forward
-
facing scoop type thru
-
hull or will be on a vessel that moves
faster than 15 knots the system needs to complete the following sea trial checks. Spectra Watermakers
reserves the right to require a sea trial from any customer before approving a commissioning report.
SEA TRIAL
□
Watermaker will flush while underway
□
Watermaker will start while underway
While the vessel is underway moving _______KNOTS/MPH/KPH the watermaker is producing _______ GPH/
LPH at ______PPM
The following checklist is designed to confirm that the watermaker installation meets Spectra
standards and that the system is performing at specification.
C
U
T
H
ER
E
Summary of Contents for VENTURA 150
Page 2: ...2...
Page 4: ...4...
Page 6: ...6...
Page 13: ...13 Installation Notes...
Page 15: ...15...
Page 16: ...16 John Guest Super Speedfit Fittings...
Page 26: ...26 Operation...
Page 27: ...27...
Page 54: ...54 Insert pdf here after conversion to pdf...
Page 56: ...56 Exploded Views Part Numbers...
Page 57: ...57...
Page 63: ...63 Parts HP CYL 3 4R...
Page 64: ...64 PL MTS 3 8X1 2B HP CYL SST HP CYL CCA SO HPP ECCB HP CYL EC HP CYL R HP CYL PT Parts...
Page 65: ...65...
Page 69: ...69...
Page 71: ...71...
Page 74: ...74...