Table of contents
4 EN
10|2018
4.2
Lifting the pump ....................................................................... 16
4.3
Storage ................................................................................... 17
4.4
Returns ................................................................................... 17
5
Installation ...................................................................................... 18
5.1
Installation site ........................................................................ 18
5.1.1
Outdoor installation ............................................................. 18
5.1.2
There must be ground drainage .......................................... 18
5.1.3
Ventilation and aeration ....................................................... 18
5.1.4
Structure-borne and airborne noise transmission ................ 18
5.1.5
Reserve space .................................................................... 18
5.1.6
Fasteners ............................................................................ 18
5.2
Pipes ....................................................................................... 19
5.2.1
Pipe sizing ........................................................................... 19
5.2.2
Laying pipes ........................................................................ 19
5.3
Installation ............................................................................... 20
5.4
Electrical connection ............................................................... 21
6
Commissioning/Decommissioning .............................................. 22
6.1
Commissioning ........................................................................ 22
6.1.1
Filling the self-priming pump with water ............................... 22
6.1.2
Checking how easily the pump rotates ................................ 22
6.1.3
Switching the pump on ........................................................ 23
6.2
Decommissioning .................................................................... 23
7
Faults .............................................................................................. 24
7.1
Overview ................................................................................. 24
7.1.1
Check the pump after the overload switch has tripped ........ 25
7.1.2
Spare parts lists................................................................... 25
8
Maintenance ................................................................................... 26
8.1
Assembling/disassembly the lid ............................................... 26
8.2
Cleaning the filter cartridges .................................................... 26
8.3
Cleaning the strainer basket .................................................... 27
8.4
Warranty ................................................................................. 27
9
Disposal .......................................................................................... 28
10
Technical data ............................................................................ 29
10.1
Filter cartridges ....................................................................... 31
Summary of Contents for BADU Star 69/12
Page 3: ...DE DE Originalbetriebsanleitung Star Komplettfilter D41 04 009 P ...
Page 7: ...Inhaltsverzeichnis 10 2018 DE 5 10 2 Maßzeichnung 31 10 3 Kennlinie 32 11 Index 33 ...
Page 36: ......
Page 37: ...EN EN Translation of original operation manual Star Complete filter D41 04 009 P ...
Page 70: ...34 10 2018 ...