
44
Operating manual Soyer Bolzenschweißtechnik
Replacing the SRM
12
support tube insert
Step 5:
Assemble the new support tube insert. Make sure the sequence
(bottom from the left to right) and orientation are correct.
Step 6:
Slide the new support ring up to the end
stop in the mounting.
When installing, make sure that the
support tube insert and the mounting
surface are clean
.
Step 7:
Hand-tighten the two threaded pins on
the tripod housing
Step 8:
Tighten the earth connection socket
head screw with a tightening torque of
250 - 300 cN.
Assembly is complete.
Summary of Contents for BMK-10i
Page 2: ......