2-1
SECTION 2
DISASSEMBLY
GV-D200/D200E/D800/D800E
The following flow chart shows the disassembly procedure.
GV
-D200/D200E/D800/D800E
2-2. Bottom cabinet assembly, FP-571 flexible board
(Lithium battery)
2-1. Cassette Lid assembly
2-3. LCD cabinet assembly (D800, D800E model)
2-5. LCD window cabinet assembly (SP-901,902)
(D800, D800E model)
2-10. Cabinet (R) block assembly, Jack frame
(IO-68, IR-38 boards)
2-12. Upper cabinet assembly,
LCD block assembly (D800, D800E model)
2-13. Hinge unit , FP-569 flexible board
(D800, D800E model)
2-6. Battery panel assembly, Battery terminal board,
DC-IN connector
2-8. Control switch block (FK-78), Loading lid
PD-130 board service position
(D800, D800E model)
2-4. PD-130, LS-56 boards (D800, D800E model)
2-9. Mechanism deck, Main frame assembly
2-11. EX-36 board, FP-570 flexible board
2-7. VC-250, FU-145 boards
[CONNECTION DIAGRAM FOR SERVICE POSITION (Mainly for voltage measurement and check)]
(VC-250, FU-145, IO-68 boards, Mechanism deck)
Summary of Contents for GV-D200E
Page 11: ...1 2 ...
Page 12: ...1 3 ...
Page 13: ...1 4 ...
Page 14: ...1 5 ...
Page 15: ...1 6 ...
Page 16: ...1 7 ...
Page 17: ...1 8 ...
Page 18: ...1 9 ...
Page 19: ...1 10 ...
Page 20: ...1 11 ...
Page 21: ...1 12 ...
Page 22: ...1 13 ...
Page 23: ...1 14 ...
Page 24: ...1 15 ...
Page 25: ...1 16 ...
Page 26: ...1 17 ...
Page 27: ...1 18 ...
Page 28: ...1 19 ...
Page 29: ...1 20 ...
Page 30: ...1 21 ...
Page 31: ...1 22 ...
Page 32: ...1 23E ...