39
• Low Tariff Charge Time: If your utility has
a low-tariff period, the storage system will
charge from the grid during this time if Grid
Enable is set to Yes.
▶
Press Continue.
9. Configure Microgrid "wake-up" times
Fig. 59 Configuring Microgrid "wake-up" times
If the storage system reaches too low of a
charge to remain active until it can charge from
the PV array, it can stop providing power until
preset times to attempt to charge. When these
times occur, the storage system will re-enable
the microgrid — or output — for seven minutes to
attempt charging from solar power.
▶
Enter the following information:
• Reenable Microgrid: Select Yes to enable this
feature, or not to leave it disabled.
• User Input Time One: Set this to the earliest
time you want to attempt charging.
• User Input Time Two: Set this to the next time
you want to attempt charging.
• User Input Time Three: Set this to the final time
you want to attempt charging.
▶
Press Continue.
10. Configure meters
Fig. 60 Configuring meters
▶
On this step, configure the meter(s) you have
installed.
▶
Select WM63-M/WM10 if you are using an
EM24 meter (default).
▶
Select whether the meter is a production or
consumption meter.
▶
Select a unique Modbus ID: 4 for production or
5 for consumption.
▶
Select channel 1.
▶
Select your metering setup.
1. Upstream PV meter (rare)
2. Not used
3. Downstream PV meter (factory default)
Summary of Contents for sonnenBatterie ecoLinx 10
Page 2: ......
Page 4: ......
Page 8: ......
Page 17: ...9 Dimensions Fig 1 Storage system dimensions Key components Fig 2 ecoLinx key components...
Page 30: ...22 page 23 page 23 page 29 page 23 Fig 22 Terminal map for ecoLinx...
Page 53: ...45 Appendix 1 Nameplates...
Page 54: ...46...
Page 55: ...47...
Page 61: ...53...
Page 62: ......
Page 63: ......