
33
8. Install vertical battery connections
Fig. 45 Installing vertical battery connections
▶
Place the narrower, handle-shaped red bus bars
on the positive terminal set screws.
▶
Place the narrower, handle-shaped black bus
bars on the negative terminal set screws.
9. Connect jumper cables
Fig. 46 Installing jumper cables
▶
If applicable, connect battery module No. 3 in
the battery cabinet to battery module No. 4
in the main cabinet using the supplied red and
black 2/0 jumper cables.
For your convenience, the ecoLinx has two 2/0
“home run” cables pre-installed.
▶
Connect the red cable to battery module No. 0.
▶
Connect the black cable to the highest-
numbered battery module.
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
B
+
B
-
ON
1
2
3
4
01
23
45
67
89
A
BC
D
EF
I/F(1)
I/F(2)
Using the
pre-installed
negative
cable,
connect the
inverter to
the highest
numbered
battery
module
Using the
pre-installed
positive
cable,
connect
the circuit
breaker
to battery
module
No. 0
Summary of Contents for sonnenBatterie ecoLinx 10
Page 2: ......
Page 4: ......
Page 8: ......
Page 17: ...9 Dimensions Fig 1 Storage system dimensions Key components Fig 2 ecoLinx key components...
Page 30: ...22 page 23 page 23 page 29 page 23 Fig 22 Terminal map for ecoLinx...
Page 53: ...45 Appendix 1 Nameplates...
Page 54: ...46...
Page 55: ...47...
Page 61: ...53...
Page 62: ......
Page 63: ......